Recent Projects Posted
UCLA Young Hall 5th Floor Lab Renovations (Rooms 5073, 5076, 5077, 5085, 5086, 5090, 5096)
Bids 2/24/26
Bids 2/24/26
RFQ-UCLA Health-Various Capital Improvements | Infrastructure Equipment Replacement Projects
Bids 2/3/26
Bids 2/3/26
UCLA Tiverton House Roof Replacement
Bids 1/27/26
Bids 1/27/26
UCLA UWVMC 2nd Floor Lab Analyzer Replacement
Bids 2/17/26
Bids 2/17/26
RFQ- 200 Medical Plaza, Third Floor Master Plan Study
Bids 11/21/25
Bids 11/21/25
UCLA Campus Wide Hydrodynamic Separator Installation
Bids 1/27/26
Bids 1/27/26




