Recent Projects Posted
UCLA Acosta Operations Center
Bids 1/13/26
Bids 1/13/26
UCLA Canyon Point HVAC Replacement
Bids 12/9/25
Bids 12/9/25
UCLA Parking Structure 18 Switzer Plaza Stabilization
Bids 12/16/25
Bids 12/16/25
RFQ- 200 Medical Plaza, Third Floor Master Plan Study
Bids 11/21/25
Bids 11/21/25
UCLA 901 Levering Student Housing
Bids 12/11/25
Bids 12/11/25
UCLA Campus Wide Hydrodynamic Separator Installation
Bids 12/16/25
Bids 12/16/25
UCLA RRUMC Room 1604J CT Replacement
Bids 12/10/25
Bids 12/10/25




