27
|
28
|
29
|
30
|
31
|
1
|
2
|
3
|
4
UCLA Research Park East Core and Shell Improvements (PREQUALIFICATION)
|
5
UCLA Sycamore Tennis Court Resurfacing
|
6
|
7
|
8
UCLA Cogeneration Plant Cooling Tower Basin Waterproofing Repair (RE-SOLICIT) PREQUALIFICATIONS
|
9
|
10
|
11
|
12
RFQ- UCLA West Valley Medical Office Building Master Plan Study, No. 908074.01
UCLA MP200 Room B114-29 Nuc Med PET CT Equipment Replacement
RFQ-UCLA Research Park Core and Shell
|
13
UCLA Sycamore Tennis Court Resurfacing
|
14
UCLA Cogeneration Plant Cooling Tower Basin Waterproofing Repair (RE-SOLICIT) PREQUALIFICATIONS
|
15
RFQ-ADA Transition Plan Accessible Paths of Travel
UCLA Research Park East Core and Shell Improvements (PREQUALIFICATION)
|
16
|
17
|
18
UCLA 901 Levering Student Housing (PREQUALIFICATION)
|
19
UCLA Mid-Wilshire Medical Office Building Seismic Improvements - BP09A - Framing & Drywall
UCLA Mid-Wilshire Medical Office Building Seismic Improvements - BP02A - Demolition
UCLA Mid-Wilshire Medical Office Building Seismic Improvements - BP03A - Concrete
|
20
UCLA Acosta Operations Center (PREQUALIFICATIONS)
UCLA Big Ten Network Phase 2 (PRIME PREQUALIFICATIONS)
|
21
|
22
|
23
|
24
|
25
UCLA 901 Levering Student Housing (PREQUALIFICATION)
|
26
UCLA Sycamore Tennis Court Resurfacing
UCLA Mid-Wilshire Medical Office Building Seismic Improvements - BP09A - Framing & Drywall
UCLA Mid-Wilshire Medical Office Building Seismic Improvements - BP02A - Demolition
UCLA Mid-Wilshire Medical Office Building Seismic Improvements - BP03A - Concrete
UCLA Gonda Center Deep Energy Project
|
27
UCLA Acosta Operations Center (PREQUALIFICATIONS)
|
28
UCLA Big Ten Network Phase 2 (PRIME PREQUALIFICATIONS)
|
29
|
30
|